November 2026
Growing oil production, expanding pipeline capacity and the Pathways Project are advancing together to ensure Canada’s oil industry attracts investment, remains competitive and is resilient for the long term. The proposed Pathways Project aims to help manage the environmental footprint of Canada’s oil sands industry and ensure the country continues to produce oil responsibly. Among the frequently asked questions about the project are those related to pipeline safety, groundwater protection, reclamation and long-term site management, as well as its role in supporting the continued growth of the oil sands.
Protecting people and communities is the primary consideration in the design, operation and monitoring of the proposed CO2 pipeline. The CO2 transportation network will primarily follow existing right-of-ways, with multiple safeguards, remote monitoring programs and an Emergency Response Plan in place to minimize risks and respond to potential concerns.
The proposed sub-surface formation for CO2 storage is separated from groundwater sources by multiple layers of rock, including cap rock. A Monitoring, Measurement and Verification Plan will be developed, detailing the monitoring and reporting practices for the life of the project.
Reclamation activities for the CO2 transportation network will begin following construction and commissioning, with the objective of returning the land to support pre-disturbance activities. Long-term site management will include the removal of above-ground facilities, abandonment of the pipeline and monitoring of stored CO2 following the end of operations.
This FAQ fact sheet covers:
- How the Pathways Project supports oil sands competitiveness and responsible development
- CO2 pipeline safety, leak detection and emergency response
- Groundwater protection and CO2 storage monitoring
- Reclamation, closure planning and long-term site management