Project proponents remain focused on understanding the concerns and addressing the issues of community stakeholders. Several themes have emerged from conversations held so far.
Below are some common questions the public often asks about the Pathways Project and carbon capture and storage.
About the Pathways Project
The project proponents are five of Canada’s largest oil sands companies – Canadian Natural, Cenovus, ConocoPhillips Canada, Imperial and Suncor.1
Canada has an opportunity to grow oil production, expand pipeline capacity and advance the Pathways Project. All three are critical and are advancing together to ensure Canada’s oil industry attracts investment, remains competitive and is resilient for the long-term:
- Production Growth – Oil sands growth requires significant capital investment, which strengthens the economy, creates jobs across the country and generates billions in government revenue, which support essential services.
- Pipelines – Expanding market access is critical to Canada’s economic growth, prosperity and energy security.
- Pathways – Managing our environmental footprint contributes to ensuring Canada continues to produce oil responsibly.
The CO2 (in a liquid state) will be injected and stored in the Basal Cambrian Sandstone (BCS) formation, roughly 1,000 to 2,000 metres underground. This formation is a porous rock (sandstone) and acts similarly to a sponge. As CO2 enters the BCS, it becomes trapped in pore spaces within the rock. Over time, the CO2 can solidify and become part of the rock itself.
Above the BCS storage layer is a thick layer of rock salt formations that are not porous, meaning liquids cannot pass through them. They act as a barrier to keep the CO2 from moving upwards, creating a natural seal.
Taken together, these geologic features ensure that injected CO2 remains permanently stored deep under the earth’s surface.
Careful site selection, suitable geology (as described above) and extensive, ongoing monitoring are key to help ensure injected CO2 remains safely stored. Part of maintaining safe, long-term CO2 storage is the development and implementation of a Measurement, Monitoring and Verification (MMV) Plan that must be approved by the regulator prior to CO2 injection. The MMV Plan will also include a risk management approach to identify and address potential issues associated with CO2 storage activities.
Each individual oil sands operator will manage carbon capture activities at their own facilities by installing CO2 capture technology. For instance, for boilers and steam generators, flue gas2 is first collected from stationary combustion equipment. The CO2 is then separated from the flue gas, compressed into liquid form and transported on a specially designed pipeline to the storage hub.
Engagement on the Pathways Project began with Indigenous groups in 2022 and expanded to include landowners, municipalities and other interested parties in 2023, providing opportunities to receive feedback and respond to public concerns.
Information about the project will continue to be shared through the Pathways Project website, which includes fact sheets, project overview documents, maps and responses to key FAQs. Further, contact information and local event schedules, where Pathways Project team members are available to respond to questions and concerns, are also posted.
Once operating, the pipeline could be made available to third parties for their own CO2 transportation requirements. The Government of Alberta requires open access of the storage hub to third-party CO2 emitters, and it is anticipated that the Pathways Project could support third-party CO2 storage.
About CCS
The Pathways Project is an opportunity to further demonstrate Canada’s leading role in the development of CCS alongside other jurisdictions. CCS has already been successfully operating in Alberta and Saskatchewan for several years.
Some of the world’s first commercial CCS projects include SaskPower’s Boundary Dam near Weyburn and the Quest project in Alberta. The successful implementation of these projects has demonstrated local expertise in constructing and operating CCS facilities.
Projects globally are using a collaborative model where governments are co-investing alongside industry to derisk investment. Projects like those underway in the Netherlands, Norway and the UK are receiving government support.
The recently announced Memorandum of Understanding (MOU) between Canada, Alberta and the Pathways Project proponents was signed to advance regulatory reforms and fiscal measures needed to support oil sands development and production growth, expand market access and move the Pathways Project forward. Construction of the Pathways Project is a critical piece of the MOU, and when combined with production growth and increased market access, there will be numerous benefits to the Canadian economy. Advancing the Pathways Project as outlined in the MOU is subject to execution of definitive agreements and regulatory approvals.
Project safety
The pipeline network will be designed, engineered and constructed to minimize risks with robust response plans in place.
The Pathways CO2 Transportation Network will be built along a stable corridor primarily following existing right-of-ways that are well understood. In the selection of the pipeline route, desktop geotechnical evaluations (e.g., boreholes) and environmental studies were done to identify and avoid areas of potential instability, where possible. Additional design considerations and remote monitoring programs will be in place for early detection and early warnings of potential concerns, where avoidance is not possible. Additionally, the Emergency Response Plan (ERP) and associated Emergency Planning Zone (EPZ) will be in place to communicate, protect the public and mitigate potential impacts. For additional information about the ERP, associated EPZ and what we have learned from historical incidents, please see the Pipeline safety and emergency management planning fact sheet.
To minimize new land disturbance, the proposed network will follow existing pipeline right-of-ways and other infrastructure corridors to the greatest extent possible. The pipeline, including route selection, must follow regulatory requirements and must specifically consider safety, environmental features, engineering design, construction constraints and public feedback, where provided, amongst other factors.
Adjustments to the proposed pipeline network routing may be made as engineering and design work progresses and input is collected from Indigenous groups, local landowners, regulators and other interested parties. Our commitment is to keep stakeholders apprised of project updates and engage in meaningful discussions to address any potential concerns.
Protecting people and communities is the primary consideration in the design, operation and monitoring of the CO2 pipeline. Multiple safeguards would be in place to prevent releases and to ensure a rapid response in the unlikely event a leak occurs. Additionally, compliance is overseen by the Alberta Energy Regulator (AER), whose role it is to balance responsible energy development with environmental protection and public interest, ensuring companies operate safely. For additional information, see our Pipeline safety and emergency management planning fact sheet.
In the event there is a pipeline leak, the CO2 will naturally disperse into the atmosphere. The CO2 will be visible, and while most CO2 releases do not pose a safety threat, if seen, it is recommended not to approach, leave the immediate area, and to contact emergency services where plans will be enacted to manage and address the release.
Pipeline safety systems are designed to quickly detect and respond to CO2 releases, with emergency shutdown valves and response plans activated automatically if a significant leak occurs.
As with any project, the Pathways Project will have a site-specific Emergency Response Plan (ERP) designed to address potential scenarios. In accordance with AER requirements, ERPs will include the implementation of a formal emergency preparedness training program, prior to the project’s operation for local first responders, where required. First responders are trained to operate in hazardous situations such as low oxygen environments, and local authorities are required to engage in regular training exercises. For additional information, see the Pipeline safety and emergency management planning fact sheet.
Environmental management
Environmental Protection Plans (EPPs) have been developed to help protect the environment and avoid or minimize potential impacts during construction, operation and reclamation. The plans outline how applicable regulatory requirements, mitigation measures, best practices and environmental commitments will be implemented throughout the project life cycle.
Key environmental field work undertaken for the CO2 transportation network include:
- Watercourse assessments and sampling at crossing locations to examine fish habitat and ensure compatible design.
- Soil sampling and vegetation mapping to support project planning and reclamation.
- Wetland mapping and assessment throughout the project area.
- Wildlife and wildlife habitat data collection to identify environmentally sensitive areas and inform mitigation measures.
- Archaeological and paleontological assessments to identify and document sites of significance.
Further information pertaining to environmental work planned for the Pathways Project can be found within the Project overview.
The Pathways Project is subject to specific and rigorous requirements through existing legislation and regulations. Information collected through initial scouting, followed by field and desktop evaluations, preparation of legal surveys, and geotechnical investigations, is used to confirm environmental conditions (e.g., key watercourses), identify unique environment features and existing infrastructure, and document known cabins, traplines and historical resources.
This information is then used to inform routing and to develop suitable mitigation measures within the project design (e.g., pipeline crossing) and regulatory applications to manage and/or reduce potential environmental impacts. Monitoring and wildlife sweeps will be completed throughout the construction phase to ensure crews are up to date on current field conditions.
Regulators have extensive experience in regulating all aspects of pipelines and injection wells in Alberta. For example, the AER regulates almost 450,000 kilometres of pipeline where it conducts surveillance and inspections, incident response and investigations.3 Further, the project is also informed by a thorough consultation and engagement process with Indigenous groups, landowners and other interested parties, where potential concerns are heard and mitigation measures are applied where feasible.
Preparation of an Environmental Impact Assessment (EIA) report is not required for the Pathways Project.
Selection of the sub-surface formation for CO2 storage is critical to ensuring containment. The sub-surface formation where the CO2 will be injected is approximately 1,000 to 2,000 metres below the surface, far deeper than groundwater sources, which are typically about 150 metres below the surface. Multiple layers of rock, including cap rock, separate the storage reservoir from groundwater.
Further, a Measurement, Monitoring and Verification (MMV) Plan will be developed, containing details on the monitoring and reporting practices for the life of the project. It requires regular updates to ensure the project meets its objective of ensuring CO2 containment within the sub-surface formation and is submitted to the AER for review and approval prior to the start of any CO2 injection activities. Please see the Storage hub safety fact sheet for further information about the MMV plan.
For the CO2 transportation network (a buried pipeline), reclamation activities begin immediately following construction and commissioning. The right-of-way is reclaimed according to stringent regulatory requirements with the objective to return the land to support pre-disturbance activities. Following operations, any above-ground facilities (e.g., valve stations, metering, etc.) will be removed, while the buried pipeline will be emptied and abandoned, in accordance with regulatory requirements.
For the CO2 storage hub, in addition to the standard regulatory requirements to abandon and seal injection wells and reclaim lands associated with above-ground facilities, a detailed Closure Plan must be approved by the regulator before CO2 injection begins. The Closure Plan includes provisions for the long-term monitoring of stored CO2 following the end of operations.
Further, the Closure Plan is subject to regular review and updates throughout the life of the project based on the results from the Monitoring, Measurement and Verification Plan.
1 For the purposes of the regulatory applications for the Pathways Project, all permits, licenses, filings, orders and approvals shall be applied for and, if approved, be in the name of Canadian Natural Resources Limited, as the proponent on behalf of Canadian Natural, Cenovus Energy Inc., ConocoPhillips Canada Resources Corp., Imperial Oil Resources Limited, and Suncor Energy Inc.
2 Flue gas is the combustion exhaust that is used to create steam for oil sands operations. It is created by natural gas fired boilers via stack, and it’s primarily composed of nitrogen (67-72%), water (18-20%) and CO2 (8-10%).
3 https://www.aer.ca/data-and-performance-reports/statistical-reports/alberta-energy-outlook-st98/pipelines-and-other-infrastructure